Start Finish Weather Filter Weight (g) Elapsed Time Reading Sampling Time Flow Rate (m3/min) TSP Conc. Action Level Limit Level Observations / Remarks Sampler Filter
Date Time Date Time   Initial Final Initial Final (hrs) Initial Final Average  (µg/m3)  (µg/m3)  (µg/m3)   ID ID
04-Sep-11 16:00 05-Sep-11 16:00 Sunny 2.8190 2.9495 9142.84 9166.84 24.00 1.3470 1.3470 1.3470 67 207 260 Dust from Project site, traffic emission and  dust from other construction sites A.001.12T 13072
10-Sep-11 16:00 11-Sep-11 16:00 Cloudy 3.1455 3.2297 9166.84 9190.84 24.00 1.3470 1.3470 1.3470 43 207 260 Dust from Project site, traffic emission and  dust from other construction sites A.001.12T 13177
16-Sep-11 16:00 17-Sep-11 16:00 Sunny 2.8019 2.8689 9190.84 9214.84 24.00 1.3470 1.3470 1.3470 35 207 260 Dust from Project site, traffic emission and  dust from other construction sites A.001.12T 13407
22-Sep-11 16:00 23-Sep-11 16:00 Cloudy 2.7686 2.9662 9214.84 9238.84 24.00 1.3430 1.3430 1.3430 102 207 260 Dust from Project site, traffic emission and  dust from other construction sites A.001.12T 13509
30-Sep-11# 14:15 01-Oct-11 14:15 Sunny 2.7668 2.8268 9262.84 9286.84 24.00 1.3470 1.3470 1.3470 31 207 260 Dust from Project site, traffic emission and  dust from other construction sites A.001.12T 13548
                        Min. 31          
                        Max. 102          
                        Average 56          
 
# The proposed 24-Hr TSP Monitoring on 29 September 2011 was re-scheduled to 30 September 2011 due to adverse weather.